📦 Items
Add Item
📂 Open Items
⏳ Pending Items
No ⏳ pending items
🔧 Wrap-up Items 3
| Context | Project | Description | Pending reason | Due | Categories | Activities | |
|---|---|---|---|---|---|---|---|
| — | — | Register uncertified sick leave | Close all activities before closing this item. | — | — | 1 | |
| Organization | — | WO Breach Report - 17-04-2026 | Close all activities before closing this item. | — | organization | 1 | |
| Organization | — | Morning Tasks - 17-04-2026 | Close all activities before closing this item. | — | organization | 1 |
✅ Closed Items
| Context | Project | Description | Notes | Status | Categories | Activities |
|---|---|---|---|---|---|---|
| Organization | — | DS Team Meeting - 14-04-2026 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 14-04-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| ESB | — | Stop WSO2, Fuse and MySQL services on DR servers to be decommissioned | ## 14 Apr 2026 * [x] Retrieve commands from Claude * [x] which servers? ... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 13-04-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 10-04-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Organization | — | WO Breach Report - 10-04-2026 | Priority: high | Closed | organization | 0 |
| OSM | — | Check items related to RFS-1-12846309167, which was close | — | Closed | requests | 0 |
| Organization | — | Morning Tasks - 09-04-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| DS | — | Linux DDBoost project - Review status and plan updates | — | Closed | requests | 0 |
| HR | — | Write to HR, when is the break process starting? | — | Closed | organization | 0 |
| ESB | — | Inform Saurav | — | Closed | — | 0 |
| HR | — | Add logs for PMDS - 08-04-2026 | Priority: high | Closed | — | 0 |
| Organization | — | Morning Tasks - 08-04-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| MediaNet | — | Investigate MediaNet downtime on April 5th | * [x] Tshoot * [x] Investigate if alerts are real, strange no ticket opened... | Closed | requests | 0 |
| — | — | a2f5f017ab has a link, but is Support Tracker area. Only UN > Application Support tickets should have a link | — | Closed | — | 1 |
| Organization | — | DS Team Meeting - 07-04-2026 | — | Closed | meetings organization | 1 |
| Organization | — | Morning Tasks - 07-04-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 1 |
| Organization | — | Morning Tasks - 06-04-2026 | - [ ] Teams as available - [ ] Update timesheet (also CTO if needed) - [ ]... | Closed | organization | 1 |
| Organization | — | Morning Tasks - 05-04-2026 | - [ ] Teams as available - [ ] Update timesheet (also CTO if needed) - [ ]... | Closed | organization | 1 |
| Organization | — | Morning Tasks - 04-04-2026 | - [ ] Teams as available - [ ] Update timesheet (also CTO if needed) - [ ]... | Closed | organization | 1 |
| Organization | — | Morning Tasks - 03-04-2026 | - [ ] Teams as available - [ ] Update timesheet (also CTO if needed) - [ ]... | Closed | organization | 1 |
| Organization | — | WO Breach Report - 03-04-2026 | Priority: high | Closed | organization | 1 |
| Organization | — | Morning Tasks - 02-04-2026 | - [ ] Teams as available - [ ] Update timesheet (also CTO if needed) - [ ]... | Closed | organization | 1 |
| — | — | Add logs for PMDS - 02-04-2026 | Priority: high | Closed | — | 0 |
| CommsNet | — | MongoDB - Set up new majority config | ## 2 Apr 2026 Change completed in PROD. | Closed | requests | 0 |
| ESB | — | Review reboot of ESB DR servers | Is this about an email? no, it was Teams message by NCC operator. iNeed... | Closed | requests | 0 |
| HR | — | Add logs for PMDS - 01-04-2026 | Priority: high | Closed | — | 0 |
| Organization | — | Morning Tasks - 01-04-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| CommsNet | — | Replica set down after issues in Brindisi datacenter | ## 31 Mar 2026 ## Report # MongoDB Troubleshooting Report **Date:**... | Closed | incidents | 0 |
| OSM | — | Disk space issue in / partition on unosm-r-app-01.global.un.org | ## 31 Mar 26 Contacted by Zeeshan by Teams. Root partition at 100% on... | Closed | incidents | 0 |
| Organization | — | DS Team Meeting - 31-03-2026 | — | Closed | meetings organization | 0 |
| Organization | — | Morning Tasks - 31-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| MediaNet | — | MediaNet – 1.1.13 - Package 36 | Task 2138 - Deployment\_PRE Task 2139 - Deployment\_PROD * [x] Deploy in... | Closed | deployments | 1 |
| Organization | — | Morning Tasks - 30-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| HR | — | Samsaran Timesheet - March 2026 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 27-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| OSM | — | Check and reply to FW rules email - RFS-1-12802029517 (OSM) | Review email: Firewall Rules request - Open Street Maps - RFS-1-12802029517.... | Closed | requests | 0 |
| OSM | — | Check and reply to FW rules email - RFS-1-12802029517 | FW rules for OSM approved by Antonio Candelaria (some rules for PSU servers... | Closed | requests | 1 |
| — | — | iNeed closing: Proxmox OSM data server migration (ST #378) | Set category + add asset to SR RFS-1-12790623077 + close WO... | Closed | — | 0 |
| OSM | — | iNeed closing + set category: Proxmox OSM data server migration (ST #378) | Before ST #378 can be closed, all of these must be done: 1. Set category on... | Closed | — | 0 |
| MediaNet | — | Medianet guidelines: Clarify STATUS OK description in Figure 7 (Giuseppe Ricco task) | Giuseppe Ricco assigned: clarify wording in guidelines where description... | Closed | requests | 0 |
| — | — | Acknowledge Acceptable Use Standard | Policy acknowledgement required. Hard deadline. | Closed | — | 0 |
| — | — | Acknowledge UNICC Info Security Policy | Policy acknowledgement required. Hard deadline. | Closed | — | 0 |
| — | — | BMS Training - BMS Basics | Mandatory training. Hard deadline end of March. [sprint:UN-S1] | Closed | — | 0 |
| HR | PMDS 2026 | Draft Begin year 2026 PMDS | Initial draft of PMDS for current review cycle. Priority this week. * [x]... | Closed | requests | 0 |
| Mission Pin Code | Mission PIN code Handover | Get Diego approval for DB backup (Mario) | Step 1 of Mario backup request. Get approval from Diego, then inform Mario... | Closed | requests | 1 |
| — | — | Call Zeeshan re OSM FW rules | Zeeshan (GIS PM) debriefs on FW rules approval stuck with Antonio Candelaria... | Closed | — | 0 |
| Mission Pin Code | Handover 2026 | Provide source code, docs and config to Mario (WO-RFS-1-12826787446) | WO: WO\-RFS\-1\-12826787446 \| Mario Sernicola \(OICT Release Manager\)... | Closed | requests | 0 |
| HR | — | Draft PMDS | Write initial draft of PMDS for current review cycle. | Closed | requests | 0 |
| — | — | Close WO-RFS-1-12791826523 | — | Closed | — | 0 |
| — | — | Radius Database Backup Request | Consolidated into item 488 - Provide DB backup and code/files to Mario | Closed | — | 0 |
| Organization | — | Morning Tasks - 18-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 1 |
| — | — | I wiki pages, make that images larger than the page are automatically shrink. And allow to have original size as well (with a magnifier icon or something similar) | [Migrated to Tracker: trk-dd695e6f8a] | Closed | — | 0 |
| — | — | In Normalized tracking prompt, the last activities appear first, it should be other way around | Example: - Create a 1 or 2 line description based on the comments for the... | Closed | — | 0 |
| ESB | — | Disable monitoring servers for ESB PROD - Open change | — | Closed | requests | 0 |
| — | — | un-st: add feature to upload files to items, put below notes as drag&drop box | [Migrated to Tracker: trk-bcb7e9858b] | Closed | — | 0 |
| — | — | Change normalized tracking UI | Put the buttons in order follwing the workflow: generate > adjust > save >... | Closed | — | 0 |
| — | — | support track - possibility to have live docs related to particular items that can be edited and saved automatically, like Excel files | [Migrated to Tracker: trk-7ccd5a4a78] | Closed | — | 0 |
| — | — | Try reverse port for Support Track | [Migrated to Tracker: trk-b3c815c9b7] | Closed | — | 0 |
| — | — | Action Required: Keep Your Contact Information Updated to Reduce Account Recovery Delays | — | Closed | — | 1 |
| — | — | Allow wiki pages to be empty, now when saving an empty page it simply doesn't save | [Migrated to Tracker: trk-2bfb882554] | Closed | — | 0 |
| — | — | ST: Servers wiki - For non-managed servers, only name, IP and Context is required. | [Migrated to Tracker: trk-74774a7e2d] | Closed | — | 0 |
| DS | — | ICT Security Service Advisory -Several Vulnerabilities (March 2026) | [sprint:UN-S1] | Closed | requests | 0 |
| Organization | — | Update CTO overtime | — | Closed | organization | 0 |
| ESB | ESB migration to Azure | Alert mechanism in ESB | [sprint:W13-UN] ## 27 Mar 26 — Progress * [x] Reviewed ESB monitoring... | Closed | requests | 0 |
| CommsNet | — | Check MongoDB vulnerability | **17 Mar 26** Checked that the vulnerability affect to version prior to... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 17-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 1 |
| UA Notifications | — | DS Team Meeting - 17-03-2026 | — | Closed | meetings organization | 1 |
| Mission Pin Code | Mission PIN code Handover | Provide data, code and other stack info about Mission Pin Code | * [x] Provide databases and server names to Mario **17 Mar 26** Provided... | Closed | requests | 0 |
| OSM | Migration to Proxmox - Phase 2 | Assist on access to unosm-r-data-01 | * [x] Ask IP to Emmanuel * [x] Check his current network segment * [x] Check... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 16-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 1 |
| Organization | — | Morning Tasks - 15-03-2026 | - [ ] Teams as available - [ ] Update timesheet (also CTO if needed) - [ ]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 14-03-2026 | - [ ] Teams as available - [ ] Update timesheet (also CTO if needed) - [ ]... | Closed | organization | 0 |
| OpsData | — | UNGSC: [SCOM] Server: opsdt-p-db-04.global.un.org | Drive Several | SOP - Linux - Logical Disk % Free Space (1) | — | Closed | incidents | 0 |
| Organization | — | WO Breach Report - 13-03-2026 | Priority: high | Closed | organization | 1 |
| Organization | — | Morning Tasks - 13-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| OpsData | — | fix Cron <root@opsdt-p-db-04> /usr/local/bin/backup_mysql.sh >/dev/null | — | Closed | requests | 0 |
| Organization | — | Morning Tasks - 12-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| ESB | ESB migration to Azure | Disable monitoring servers for ESB PROD | ## 7 Apr 2026 * [x] Open change Enterprise Service Bus (ESB) –... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 11-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| UA Notifications | — | DS Team Meeting - 10-03-2026 | — | Closed | meetings organization | 0 |
| Organization | — | Morning Tasks - 10-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 09-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Organization | — | WO Breach Report - 06-03-2026 | Priority: high | Closed | organization | 0 |
| Organization | — | Morning Tasks - 06-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 05-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| DS | Batch 5A (Saturday) - Windows updates on SQL Server of critical applications - February 2026 | Windows updates - Update Knowledge Base | — | Closed | — | 0 |
| Organization | — | Morning Tasks - 04-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| UA Notifications | — | DS Team Meeting - 03-03-2026 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 03-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Unite Aware | — | Unite Aware Audit | — | Closed | — | 0 |
| Organization | — | Morning Tasks - 02-03-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| HR | — | Samsaran Timesheet - February 2026 | — | Closed | organization | 0 |
| DS | Batch 5A (Saturday) - Windows updates on SQL Server of critical applications - February 2026 | C76060 - Batch 5A installation - Secondary nodes - Windows updates on SQL Server of critical applications | — | Closed | — | 0 |
| Organization | — | WO Breach Report - 27-02-2026 | Priority: high | Closed | organization | 0 |
| Organization | — | Morning Tasks - 27-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| AOM | — | Add missing assets | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 26-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 25-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| DS | Batch 5A (Saturday) - Windows updates on SQL Server of critical applications - February 2026 | Windows updates - Batch 5A preparation tasks | # Notes One Note: DS Team >... | Closed | requests | 0 |
| HR | — | MANDATORY TRAINING ASSIGNMENT OF I know Gender | Complete on WHO iLearn platform. Hard deadline March 31 (email reminder Mar... | Closed | training | 1 |
| UA Notifications | — | DS Team Meeting - 24-02-2026 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 24-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Unite Aware | — | Coordinate changes of backup strategy HCO/Dev/AOM | — | Closed | requests | 0 |
| Organization | — | Morning Tasks - 23-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 22-02-2026 | * [ ] Teams as available * [ ] Update timesheet (also CTO if needed) * [ ]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 21-02-2026 | * [ ] Teams as available * [ ] Update timesheet (also CTO if needed) * [ ]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 20-02-2026 | * [ ] Teams as available * [ ] Update timesheet (also CTO if needed) * [ ]... | Closed | organization | 0 |
| Organization | — | WO Breach Report - 20-02-2026 | Priority: high | Closed | organization | 0 |
| CommsNet | — | PRE - add disk for /var/lib/docker and remove folder from /var | # Notes Message from Santiago: I asked Miguel Angel about this ticket and... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 19-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| OSM | Migration to Proxmox - Phase 2 | Migration to Proxmox - Prepare OSM data server migration | scheduled for 26 Feb Servers unosm-r-data-01 unosm-r-app-01 | Name | IP... | Closed | requests | 0 |
| UN Vector Tiles | Migration to Proxmox - Phase 2 | Migration to Proxmox - Prepare Vector Tiles migration | ## Updates **5 Feb 26** Reviewed the document from Teresa, Found the server... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 18-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| — | Migration to Proxmox - Phase 2 | Migration to Proxmox - Update status Excel file | — | Closed | — | 0 |
| Organization | — | Morning Tasks - 17-02-2026 | * [ ] Teams as available * [ ] Update timesheet (also CTO if needed) * [ ]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 16-02-2026 | * [ ] Teams as available * [ ] Update timesheet (also CTO if needed) * [ ]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 15-02-2026 | * [ ] Teams as available * [ ] Update timesheet (also CTO if needed) * [ ]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 14-02-2026 | * [ ] Teams as available * [ ] Update timesheet (also CTO if needed) * [ ]... | Closed | organization | 0 |
| Organization | — | WO Breach Report - 13-02-2026 | Priority: high | Closed | organization | 0 |
| Organization | — | Morning Tasks - 13-02-2026 | * [ ] Teams as available * [ ] Update timesheet (also CTO if needed) * [ ]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 12-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| — | Migration to Proxmox - Phase 2 | Check status of UN OSM server | — | Closed | — | 0 |
| OSM | Migration to Proxmox - Phase 2 | Consolidate new rules in FW rules tracker | — | Closed | requests | 0 |
| CommsNet | Migration to Proxmox - Phase 2 | Migration to Proxmox - MongoDB - Fix arbiter issues | Fixed by Pavia | Closed | requests | 0 |
| CommsNet | Migration to Proxmox - Phase 2 | UHF connectivity issues and 499 status errors on Nginx | **11 Feb 26** \- Call with Jesus\. We start checking the UHF issues as... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 11-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| HR | — | Add logs for PMDS - 11-02-2026 | Priority: high | Closed | organization | 0 |
| CommsNet | Migration to Proxmox - Phase 2 | Migration to Proxmox - CommsNet PRD | 10 Feb 26 * Stopped services * Started services after the change * Started... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 10-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| UA Notifications | — | DS Team Meeting - 10-02-2026 | — | Closed | meetings organization | 0 |
| Organization | — | Morning Tasks - 09-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| HR | — | Out of Office message | — | Closed | organization | 0 |
| Organization | — | WO Breach Report - 06-02-2026 | Priority: high | Closed | organization | 0 |
| Organization | — | Morning Tasks - 06-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 05-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| HR | — | Request leave days Suiza | **4 Feb 26** Talked to HR, they told me to request leaves as confirmed when... | Closed | organization | 0 |
| UA Notifications | Migration to Proxmox - Phase 2 | Migration to Proxmox - Phase 2 - Migrate Notifications PROD | \- C75599 opened for production \- RFS\-1\-12761538411 opened for PSU/Rosa... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 04-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| UN Vector Tiles | Migration to Proxmox - Phase 2 | Migration to Proxmox - Phase 2 - Review Vector Tiles migration | ## Updates **5 Feb 26** Reviewed the document from Teresa, Found the server... | Closed | requests | 0 |
| AOM | — | Jose Silla retirement - gift contribution | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 03-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| UA Notifications | — | DS Team Meeting - 03-02-2026 | — | Closed | meetings organization | 0 |
| Organization | — | Morning Tasks - 02-02-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| HR | — | Samsaran Timesheet - January 2026 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 30-01-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Organization | — | WO Breach Report - 30-01-2026 | WO-RFS-1-12753519073 - add communication - action: close... | Closed | organization | 0 |
| DS | SQL Server updates: VSTA & SSMS | SQL Server updates: VSTA & SSMS - Platform Management | ## Activities **29 Jan 26** * No vulnerability found for SSMS. Tried to... | Closed | — | 0 |
| ESB | ESB migration to Azure | Coordination tasks with ESB project management | * Proxmox migration * IP change. **Not needed, servers are legacy** ... | Closed | — | 0 |
| DS | SQL Server updates: VSTA & SSMS | SQL Server updates: VSTA & SSMS - Peacekeeping Capability Readiness System (PCRS) | ## Activities **29 Jan 26** * Installed VSTA 2017 in PRE and PROD... | Closed | — | 0 |
| DS | SQL Server updates: VSTA & SSMS | SQL Server updates: VSTA & SSMS - LN Read-Only (LNAM) | ## Activities **29 Jan 26** * Installed VSTA 2017 in PRE and PROD... | Closed | — | 0 |
| DS | SQL Server updates: VSTA & SSMS | SQL Server updates: VSTA & SSMS - Umoja Material Master Cockpit | ## Activities **29 Jan 26** * Installed VSTA in PRE environment. No... | Closed | — | 0 |
| Organization | — | Morning Tasks - 29-01-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| UA Notifications | Migration to Proxmox - Phase 2 | Migration to Proxmox - Phase 2 - Firewall Rules preparation for Notifications | ## Emails and documents Migration to Proxmox - Phase 2 - Firewall Rules... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 28-01-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| ICC Training | — | Prevention and Response to Sexual Misconduct workshop | — | Closed | training | 0 |
| AOM | — | DSB Work Plan - Closure of 2025 | — | Closed | meetings | 0 |
| HR | — | Acknowledgement for policies | — | Closed | requests | 0 |
| UA Notifications | — | DS Team Meeting - 27-01-2026 | Priority: high | Closed | meetings organization | 0 |
| Organization | — | Morning Tasks - 27-01-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| DS | SQL Server updates: VSTA & SSMS | SQL Server updates: VSTA & SSMS - DFS-UGISSQL-01 | ## Activities **26 Jan 26** * Call with Jose to coordinate the updates and... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 26-01-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 23-01-2026 | * [x] Teams as available * [x] Update timesheet (also CTO if needed) * [x]... | Closed | organization | 0 |
| Organization | — | WO Breach Report & Communications - 23-01-2026 | DS Team | SR Number | WO Number | Status | Sub-Status | Priority | Days... | Closed | organization | 0 |
| Organization | — | Morning Tasks - 22-01-2026 | * [x] Teams as available * [x] Update Excel timesheet (Update CTO if needed)... | Closed | organization | 0 |
| ESB | — | OICT: [SCOM] Server: vavm0760.edcv.un.org | Drive /home | SOP - Linux - Logical Disk % Free Space | **21 Jan 26** * Solved by deleting the backup of the Haddop file moved... | Closed | incidents | 0 |
| DS | Batch 5A (Saturday) - Windows updates on SQL Server of critical applications - February 2026 | C76061 - Batch Installation - Windows Updates and Clustered SQL Maintenance of Critical Applications | \- import file from Alberto \- abrir Excel \(buscar ruta\) INSTRUCTIONS... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 21-01-2026 | * [x] Teams as available * [x] Update Tracking Info and CTO * [x] Check... | Closed | organization | 0 |
| ESB | — | vavm0760.edcv.un.org | Drive /opt | SOP - Linux - Logical Disk % Free Space | **20 Jan 26** Solved by moving data from... | Closed | incidents | 0 |
| Organization | — | Morning Tasks - 20-01-2026 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 20-01-2026 | Priority: high | Closed | organization | 0 |
| UA Notifications | — | DS Team Meeting - 20-01-2026 | Priority: high | Closed | meetings organization | 0 |
| Organization | — | Morning Tasks - 19-01-2026 | Priority: high | Closed | organization | 0 |
| DS | — | Review Cybersecurity Advisories | # Emails * FW: ICT Security Service Advisory - Microsoft Patch Day (January... | Closed | requests | 0 |
| AOM | — | Morning Shift 16-01-2026 | — | Closed | requests | 0 |
| Organization | — | Morning Tasks - 16-01-2026 | — | Closed | organization | 0 |
| Organization | — | WO Breach Report - 16-01-2026 | — | Closed | organization | 0 |
| AOM | — | Information request about Mission Pin Code | — | Closed | requests | 0 |
| AOM | — | Node.js vulnerability | # Notes **15 Jan** * Nadia Rando contacted me on Teams to check if we have... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 15-01-2026 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 14-01-2026 | — | Closed | organization | 0 |
| HR | — | Add logs for PMDS - 14-01-2026 | — | Closed | requests | 0 |
| MediaNet | — | Issues in MediaNet PRE after proxmox migration | The master container of node 02 was stucked. Restarting it fixed the issue. | Closed | requests | 0 |
| DS | — | Review DRX Plan 2026 | # Activities **15 Jan** * Checked with Jesus and Eladio. Jesus said in his... | Closed | requests | 0 |
| CommsNet | — | CommsNet PRE migration to Proxmox | **13 Jan** * Santiago is doing migration to Proxmox today on CommsNet PRE,... | Closed | requests | 0 |
| ICC Training | — | Action Required - BMS Training: BMS Basics | [sprint:UN-S1] | Closed | training | 0 |
| Organization | — | Morning Tasks - 13-01-2026 | — | Closed | organization | 0 |
| UA Notifications | — | DS Team Meeting - 13-01-2026 | — | Closed | meetings organization | 0 |
| Organization | — | Morning Tasks - 12-01-2026 | — | Closed | organization | 0 |
| UA Notifications | — | User Management Console 1.0.6 | # Notes **13 Jan** * Worked on automating the upload of files to the... | Closed | deployments | 0 |
| Organization | — | Morning Tasks - 09-01-2026 | — | Closed | organization | 0 |
| Organization | — | WO Breach Report - 09-01-2026 | Review completed. | Closed | organization | 0 |
| AOM | — | Verification of UNOE in Valencia for FY2025/26 personal IT devices OF5 | ### Emails Verification of UNOE in Valencia for FY2025/26 personal IT devices OF5 | Closed | requests | 0 |
| DS | — | Request FW rules for Jose P. | Dear colleagues, Could you please implement the fw rules in the attached... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 08-01-2026 | — | Closed | organization | 0 |
| HR | — | URGENT – Action Required on 2025 Timesheets (Deadline: Tomorrow) | https://icc-prod-finance.operations.dynamics.com/?cmp=ICC&mi=DefaultDashboard... | Closed | requests | 0 |
| AOM | — | iNeed Work Orders - Missing Asset Report - 2026-01-07 | Added missing assets to WO in the report. Expected that tomorrow no WO will... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 07-01-2026 | — | Closed | organization | 0 |
| Organization | — | Obsidian - Close (DS) Review Backup strategy for Linux applications | obsidian://open?vault=IT&file=Zet%2F(DS)%20Review%20Backup%20strategy%20for%2... | Closed | organization | 0 |
| ESB | — | OICT: [SCOM] Server: NYVM2521.edc.un.org and NYVM2526.edc.un.org | Linux computer has been rebooted | ##### OICT: \[SCOM\] Server: NYVM2521\.edc\.un\.org and... | Closed | incidents | 0 |
| DS | — | Action Required: Security Advisory Compliance Reporting | # Emails * Action Required: Security Advisory Compliance Reporting #... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 06-01-2026 | — | Closed | organization | 0 |
| UA Notifications | — | DS Team Meeting - 06-01-2026 | — | Closed | meetings organization | 0 |
| IPPC | — | SSL Certificate issue in IPPC | — | Closed | requests | 0 |
| Organization | — | Morning Tasks - 05-01-2026 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 03-01-2026 | — | Closed | organization | 0 |
| ESB | — | OICT: [SCOM] Server: vavm0760.edcv.un.org | SOP - Linux - CPU Linux Total % Processor Time (2) | — | Closed | incidents | 0 |
| HR | — | Update leave days for 2026 from GSM | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 02-01-2026 | — | Closed | organization | 0 |
| Organization | — | WO Breach Report - 02-01-2026 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 01-01-2026 | — | Closed | organization | 0 |
| DS | — | Request FW rules for Jose P. | — | Closed | requests | 0 |
| DS | — | Create disk space request for Jose P. | Created the request (RFS-1-12724091437) and sent the reference to Jose.... | Closed | requests | 0 |
| OSM | New OSM updates procedure - Consolidate and execute | OSM Monthly patches - January | **22 Jan 26** * Gather details about infrastructure | Closed | requests | 0 |
| Organization | — | Morning Tasks - 31-12-2025 | — | Closed | organization | 0 |
| CommsNet | — | Cybersecurity Advisory - MongoDB-Server-DOS Vulnerability | MongoDB servers are scheduled to be updated to version 7.0.28 as part of the... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 30-12-2025 | — | Closed | organization | 0 |
| UA Notifications | — | DS Team Meeting - 30-12-2025 | — | Closed | meetings organization | 0 |
| Organization | — | Morning Tasks - 29-12-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 28-12-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 27-12-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 26-12-2025 | — | Closed | organization | 0 |
| Organization | — | WO Breach Report - 26-12-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 25-12-2025 | — | Closed | organization | 0 |
| ESB | — | OICT: [SCOM] Server: vavm0757.edcv.un.org | Drive /opt | SOP - Linux - Logical Disk % Free Space | #### Emails RE: T2| HCO| OICT: [SCOM] Server: vavm0757.edcv.un.org | Drive... | Closed | requests | 0 |
| Organization | — | Morning Tasks - 24-12-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 23-12-2025 | — | Closed | organization | 0 |
| UA Notifications | — | DS Team Meeting - 23-12-2025 | — | Closed | meetings organization | 0 |
| Organization | — | Morning Tasks - 22-12-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 21-12-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 20-12-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 19-12-2025 | — | Closed | organization | 0 |
| Organization | — | WO Breach Report - 19-12-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 18-12-2025 | — | Closed | organization | 0 |
| HR | — | UNICC All Hands meeting | — | Closed | UNICC Meetings | 0 |
| Organization | — | Out of office message | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 17-12-2025 | — | Closed | organization | 0 |
| UA Notifications | — | DS Team Meeting - 16-12-2025 | — | Closed | meetings organization | 0 |
| OpsData | — | UNGSC: [SCOM] Server: opsdt-p-db-04.global.un.org | Several Drives | SOP - Linux - Logical Disk % Free Space (1) | IM-1-12709506052 | — | Closed | incidents | 0 |
| Organization | — | Morning Tasks - 16-12-2025 | — | Closed | organization | 0 |
| MediaNet | — | Provide config file from PROD environment to developers | perdona carlos, para el tema de la imagen para ver si esta todo bien... | Closed | requests | 0 |
| Organization | — | WO Breach Report | — | Closed | organization | 0 |
| Organization | — | Morning Tasks - 15-12-2025 | — | Closed | organization | 0 |
| UN Base | — | UN Base - Monthly Updates - December 2025 | ##### Notes ~~Pending to open change for Dec 23~~ ~~**C74678 opened for Dec... | Closed | deployments | 0 |
| Organization | — | Morning Tasks - 12-12-2025 | — | Closed | organization | 0 |
| OSM | — | Handover of monthly patches | ~~Discuss the handover of OS updates, similarly as we do for UN Base.~~... | Closed | requests | 0 |
| — | — | [Feature] Don't allow close item if any activity is open | — | Closed | — | 0 |
| ESB | — | vavm0757 disk space issues | Pending additional disk space request. | Closed | incidents | 0 |
| Organization | — | Morning Tasks 12-12-2025 | — | Closed | organization | 0 |
| UA Notifications | — | UMC - Add UNDOF mission | — | Closed | requests | 0 |
| Organization | — | Morning Tasks 10-12-2025 | — | Closed | organization | 0 |
| ESB | — | Do you have any idea whether the ip 94.130.64.9 refers to our netscaler load balancer in QA environment? | — | Closed | requests | 0 |
| UA Notifications | — | DS Team Meeting 09-12-2025 | — | Closed | meetings organization | 0 |
| Organization | — | Morning Tasks 09-12-2025 | — | Closed | organization | 0 |
| ESB | — | Add update to WO-RFS-1-12571390541 | — | Closed | requests | 0 |
| OpsData | — | UNGSC: [SCOM] Server: opsdt-p-db-04.global.un.org | Several drives | Logical Disk % Free Space (1) || IM-1-12696225458 | — | Closed | incidents | 0 |
| HR | — | Update GSM Uncertified Leaves | — | Closed | organization | 0 |
| Organization | — | Morning Tasks 05-12-2025 | — | Closed | organization | 0 |
| — | — | [Feature] In Open Items, filter by projects or category | — | Closed | — | 0 |
| Organization | — | Morning Tasks 03-12-2025 | — | Closed | organization | 0 |
| Mission Pin Code | — | URGENT - Self-certification of applications and public websites | — | Closed | requests | 0 |
| DS | — | Close 245 days WO | — | Closed | organization | 0 |
| DS | — | DS Weekly Team Meeting 02-12-2025 | — | Closed | meetings | 0 |
| — | — | [Feature] Add recurrent automatic items and activities | for morning tasks, DS meeting, Samsaran | Closed | — | 0 |
| UA Notifications | — | Upload configuration change to NGINX - Adding max-age to UMC | [NOTIFICATIONS] Upload configuration change to NGINX: Adding max-age to UMC | Closed | requests | 0 |
| Organization | — | Morning Tasks 02-12-2025 | — | Closed | organization | 0 |
| UA Notifications | — | Upload configuration change to NGINX - Adding max-age to navigation bar | — | Closed | requests | 0 |
| — | — | [Feature] Add notes to the items | — | Closed | — | 0 |
| UA Notifications | — | Changes in NGINX configuration files in Notifications Platform | — | Closed | requests | 0 |
| ESB | — | OICT: [SCOM] Server: vavm0922.edcv.un.org | Drive /opt | SOP - Linux - Logical Disk % Free Space (1) | New email: OICT: [SCOM] Server: vavm0922.edcv.un.org | Drive /opt | SOP -... | Closed | incidents | 0 |
| Sage | — | Follow up on RFS-1-12685334511, related to Sage PRE deployment | **FW Rules already implemented. Completed** | Closed | requests | 0 |
| Organization | — | Morning tasks 01-12-2025 | — | Closed | organization | 0 |
| Sage | — | Run SageDM_Daily ETL process to load SAGE_DM into PREPROD | 28-11-2025 - The job failed in PRE. Performed tshoot with Sandra and... | Closed | requests | 0 |
| HR | — | Samsaran Timesheet December | — | Closed | organization | 0 |
| AOM | — | CM REMINDER ## C74286 | — | Closed | organization | 0 |
| Organization | — | Morning tasks 27-11-2025 | — | Closed | organization | 0 |
| — | — | [Feature] Create a CTO tracking page | — | Closed | — | 0 |
| — | — | [Change] Remove project bundles in taxonomy | — | Closed | — | 0 |
| DS | — | CTO Overtime December | — | Closed | organization | 0 |
| — | — | [Feature] Add "check as done" button to activities inside edit item context | — | Closed | — | 0 |
| UA Notifications | — | User Management Console - Release 1.0.5 | — | Closed | deployments | 0 |
| Organization | — | Morning Tasks 26-11-2025 | — | Closed | organization | 0 |
| — | — | Create Github repo for Jupyter NBs | — | Closed | — | 0 |
| UA Notifications | — | DS Team meeting 25-11-2025 | — | Closed | meetings organization | 0 |
| — | — | [Feature] Create specific section for overdue/due soon activities in activities page | — | Closed | — | 0 |
| — | — | [Feature] Duplicate button for items | [Migrated to Tracker: trk-b618a41e2d] | Closed | — | 1 |
| Organization | — | CTO Overtime November | — | Closed | organization | 0 |
| UA Notifications | — | Update Notifications ISCP | # Activities **16 Jan** * Filled the ISCP with new servers. Contacted... | Closed | requests | 0 |
| — | — | [Feature] Add bundles for projects and tickets | — | Closed | — | 0 |
| DS | — | Review email from Pavia | — | Closed | requests | 0 |
| ESB | — | OICT: [SCOM] Server: vavm0923.edcv.un.org | Drive /opt | SOP - Linux - Logical Disk % Free Space (1) | — | Closed | requests | 0 |
| HR | — | Request leave Compensatory 18-19 Dec | — | Closed | organization | 0 |
| HR | — | Request leave Compensatory 28 Nov | — | Closed | organization | 0 |
| HR | — | Update UNICC password | — | Closed | requests | 0 |
| Organization | — | Morning Tasks 24-11-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks 20-11-2025 | — | Closed | organization | 0 |
| ESB | — | RE: OICT: [SCOM] Server: vavm0923.edcv.un.org | Drive /opt | SOP - Linux - Logical Disk % Free Space (2) |IM-1-12676760086 | — | Closed | requests | 0 |
| UA Notifications | — | Provide config files to developers - 19-11-2025 | — | Closed | requests | 0 |
| UA Notifications | — | Notifications Release 1.1.6 | — | Closed | deployments | 0 |
| UA Notifications | — | DS Team Meeting 18-11-2025 | — | Closed | meetings organization | 0 |
| AOM | — | DO Report FSS incident | — | Closed | requests | 0 |
| Organization | — | Morning tasks 18-11-2025 | — | Closed | organization | 0 |
| OSM | — | Migration of Open Street Map Server (ImpOSM) to Proxmox | **Completed** | Closed | projects | 0 |
| UA Notifications | — | Provide config file to developers | — | Closed | requests | 0 |
| UA Notifications | — | Upgrade Apache Tomcat in Notifications Platform | — | Closed | deployments | 0 |
| DS | — | DDBoost backup meeting | — | Closed | meetings | 0 |
| OSM | — | Monthly Maintenance - OSM Map Monthly Linux Updates | — | Closed | deployments | 0 |
| HR | — | Track uncertified in GSM | — | Closed | organization | 0 |
| HR | — | Request leave Compensatory 21 Nov | — | Closed | organization | 0 |
| Organization | — | Morning tasks 17-11-2025 | — | Closed | organization | 0 |
| — | — | [Bug] Fix adding SR - WO (format, and going back to Items when saving) | — | Closed | — | 0 |
| ESB | — | vavm0923.edcv.un.org and vavm0922.edcv.un.org disk space issues | — | Closed | incidents | 0 |
| AOM | — | Duty Officer - Prepare RDM and KB | — | Closed | organization | 0 |
| — | — | [Bug] Delete activity button doesn't work | — | Closed | — | 0 |
| UA Notifications | — | Log4j vulnerability detected in UA Notifications servers | — | Closed | requests | 0 |
| ESB | — | Log4j vulnerability detected in ESB servers | # Emails * Follow-up on ESB Cybersecurity Advisories # Notes * 09/01 Sent... | Closed | requests | 0 |
| Organization | — | Morning tasks 13-11-2025 | — | Closed | organization | 0 |
| — | — | Read about digital gardening | — | Closed | — | 0 |
| — | — | Deep dive - ACID | — | Closed | — | 0 |
| — | — | [Bug] All Projects (no bundle selected) show no activities in Activities page in Personal workspace | — | Closed | — | 0 |
| — | — | Make the activity logs in increments of 15 minutes | [Migrated to Tracker: trk-38aeeaf65e] | Closed | — | 1 |
| — | — | [Bug] 404: POST /activities/34/delete | — | Closed | — | 0 |
| — | — | Normalize time tracking for days that look empty | [Migrated to Tracker: trk-2f041b79f7] | Closed | — | 1 |
| — | — | Bundle feature resets when running activities | — | Closed | — | 0 |
| Unite Aware | — | Disable TLS v1.0 and 1.1 from postfix SMTP | — | Closed | requests | 0 |
| Organization | — | Morning Tasks 12-11-2025 | — | Closed | organization | 0 |
| UA Notifications | — | Notifications Release 1.1.5.2 | — | Closed | deployments | 0 |
| Organization | — | Morning tasks 10-11-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks 07-11-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks 07-11-2025 | — | Closed | organization | 0 |
| Organization | — | Morning Tasks 06-11-2025 | — | Closed | organization | 0 |
| ESB | — | vavm0923.edcv.un.org - opt - Disk % Free Space | — | Closed | incidents | 0 |
| UA Notifications | — | Provide FLTS files to devs for analysis | — | Closed | requests | 0 |
| ESB | — | ESB issues to be discussed and improved in knowledge base | — | Closed | requests | 0 |
| — | — | No delete option for items | — | Closed | — | 0 |
| — | — | Logs still showing wrong time | — | Closed | — | 0 |
| UN Dashboard | — | Logs still showing wrong time | — | Closed | organization | 0 |
| DS | — | DS Weekly Team Meeting | — | Closed | meetings | 0 |
| Organization | — | Morning Tasks 04/11/2025 | — | Closed | organization | 0 |
| ESB | — | Disk space 100% usage in opt partition accross DB servers | — | Closed | requests | 0 |
| Organization | — | Morning Tasks 03/11/2025 | — | Closed | organization | 0 |
| HR | — | Samsaran Timesheet November | — | Closed | organization | 0 |
| UA Notifications | — | Initial installation of the Navigation Bar Front-end in PRE & PROD | — | Closed | deployments | 0 |
| DS | — | WO Breach Report 31/10/2025 | — | Closed | requests | 0 |
| — | — | [Bug] Unable to delete WO and RFS from items edit list | — | Closed | — | 0 |
| — | — | Financial Update - November | — | Closed | — | 0 |
| AOM | — | Morning Tasks 31/10/2025 | — | Closed | organization | 0 |
| — | — | Add personal workspace | — | Closed | — | 0 |
| AOM | — | DO Rationalization Presentation | — | Closed | meetings | 0 |
| AOM | — | Morning Tasks 30/10/2025 | — | Closed | organization | 0 |
| HR | — | Request leave 11 November | — | Closed | organization | 0 |
| DS | — | DS Weekly Team Meeting 28/10/25 | — | Closed | meetings | 0 |
| UA Maps | — | UAMAPS PRE-PRO - Add redis support to frontends | — | Closed | requests | 0 |
| Unite Aware | — | Unite Aware NETSCALERS - Session affinity limited to 2 minutes - request to raise it | — | Closed | requests | 0 |
| UA Maps | — | UAMAPS PROD - Add entry to hosts file | — | Closed | requests | 0 |
| — | — | Requests from Santiago | — | Closed | — | 0 |
| ESB | — | OICT Server - NYVM2528.edc.un.org - opt partition - Logical Disk % Free Space | — | Closed | incidents | 0 |
| HR | — | Samsaran Timesheet October | — | Closed | organization | 0 |
| ESB | — | iNeed Notification REST API release deployment | — | Closed | requests | 0 |
| AOM | — | Morning Shift 27/10/2025 | — | Closed | requests | 0 |
| UA Maps | — | Add entry to /etc/hosts | — | Closed | requests | 0 |
| UA Notifications | — | Config files to overwrite in PRE & PROD | — | Closed | requests | 0 |
| AOM | — | UNGSC Townhall in occasion of the visit of the Director Mr. Anton Antchev | — | Closed | meetings | 0 |
| DS | — | [R] DS Team Meeting October | — | Closed | projects | 0 |
| AOM | — | Review RedHat applications meeting | — | Closed | meetings | 0 |
| AOM | — | DSB Meeting 20/10 | — | Closed | organization | 0 |
| CommsNet | — | Request FW rules to reach a destination from CommsNet frontends | — | Closed | requests | 0 |
| HR | — | Managed Service - All staff meeting | — | Closed | UNICC Meetings | 0 |
| ESB | — | vavm0922.edcv.un.org - Drive tmp - SOP - Linux - Logical Disk % Free Space | — | Closed | incidents | 0 |
| CommsNet | — | Update Unite Apps URL | — | Closed | requests | 0 |
| DS | — | Log4j vulnerability detected in ESB and UA Notifications servers | # Notes * Fixed for Notifications, pending to fix for ESB | Closed | requests | 0 |
| ESB | — | OICT: [SCOM] Server: vavm0756.edcv.un.org | Drive /tmp | SOP - Linux - Logical Disk % Free Space | — | Closed | requests | 0 |
| AOM | — | Algosec Firewall Analyzer Demo - Meeting | — | Closed | projects | 0 |
| UA Notifications | — | Provide config files to developer | — | Closed | requests | 0 |
| HR | — | Request pending compensatory days | — | Closed | organization | 0 |
| AOM | — | Morning Shift 15/10/2025 | — | Closed | requests | 0 |
| HR | — | Half Uncertified Sick leave 14/10/25 | — | Closed | requests | 0 |
| ESB | — | WSO2 API Manager - Plan to bring up the 2nd server | — | Closed | requests | 0 |
| ESB | — | Apply security fix and restart secondary WSO2 node | — | Closed | requests | 0 |
| DS | — | [R] WO Breach Report October | — | Closed | organization | 0 |
| ESB | — | Provide server list to APP team | — | Closed | requests | 0 |
| HR | — | PMDS 2024/2025 | * Working on the End Year PMDS draft. Completed the draft and will send to... | Closed | projects | 0 |
| ESB | — | OutOfMemoryError was found on server UN-API-P-GW-001.edcv.un.org | — | Closed | requests | 0 |
| AOM | — | [R] Morning Tasks October | — | Closed | organization | 0 |
| HR | — | Apply as Staff Representative | — | Closed | projects | 0 |
| AOM | — | Morning tasks 09-10-2025 | — | Closed | organization | 0 |
| Mission Pin Code | — | Investigate and fix replica issues in backend | testing notes | Closed | projects incidents | 0 |
| DS | — | Update CTO Excel - Week 6 Oct | — | Closed | organization | 0 |
| AOM | — | Morning tasks 8/10/25 | — | Closed | organization | 0 |
| — | — | Book Recommendations | — | Closed | — | 0 |
| AOM | — | Preparation meeting for CommsNet, MediaNet, Notifications DRXs | — | Closed | projects | 0 |
| ESB | — | Review Backup strategy | We are moving to DDBOOST, so previous backup strategy is no longer needed.... | Closed | projects | 0 |
| ESB | — | Please conduct assessment to WSO2 API Manager Affected ICT resources - WSO2 API Manager 2.0.0 and earlier | — | Closed | requests | 0 |
| Mission Pin Code | Mission PIN code - Migration to GLOBAL | Migration to GLOBAL - Initial coordination | — | Closed | projects | 0 |
| Sage | — | Integration of the SAGE UNAMA form “UNDSS Security Incident” into Power BI | — | Closed | requests | 0 |
| AOM | — | Morning tasks 6/10 | — | Closed | organization | 0 |
| CommsNet | — | RHEL 9 missing updates | — | Closed | requests | 0 |
| AOM | — | Morning tasks 03/10/25 | — | Closed | organization | 0 |
| AOM | — | Duty Officer Incident Report - Building system | — | Closed | projects | 0 |
| UA Notifications | — | Notifications Release 1.1.5 | — | Closed | requests | 0 |
| ESB | — | Recurrent memory issues on WSO2 production | — | Closed | requests | 0 |
| AOM | — | Conduct ASU Daily Morning Checks (01/10/2025) | — | Closed | requests | 0 |
| ESB | — | UNGSC: [SCOM] Application: Several ESB REST API services unavailable | IM-1-12591273206 | — | Closed | incidents | 0 |
| ICC Training | — | AWS Data & AI Roadshow Workshop | — | Closed | projects | 0 |
| Unite Aware | — | Support migration to Proxmox for Unite Aware apps | — | Closed | requests | 0 |
| HR | — | Samsaran Timesheet | — | Closed | organization | 0 |
| — | — | testing new item | — | Closed | — | 0 |
| UA Notifications | — | DS Team Meeting 30/09/25 | — | Closed | requests organization | 0 |
| AOM | — | Morning Tasks | — | Closed | organization | 0 |
| — | — | Creating Support Track dashboard | — | Closed | — | 0 |