SupportTrack
Today
Items
Projects
Time
Logs
Timesheet
CTO Time
Reports
Overview
Meeting Notes
Activity Summary
PMDS Activity Summary
Time by Category
Time by Item
Normalized Tracking
Taxonomy
Automation
PMDS
Templates
Knowledge Base
Wiki
Organigram
Servers
URLs
Firewall Rules
--:--
MAD
NY
--:--
· IN
--:--
⏱️
No tasks running
⏹️
Wiki
Back
Edit page
ESB — Enterprise Service Bus
Title
Slug
Status
Draft
Verified
Needs Review
Context
No context
AOM
CommsNet
DS
ESB
FSS
GIS
HR
ICC Training
IPPC
MediaNet
Mission Pin Code
OpsData
Organization
OSM
Sage
UA Maps
UA Notifications
UN Base
UN Dashboard
Unite Aware
UN Vector Tiles
Categories
Application Info
Documentation
General
Known Issue
Procedures
Tshoot
Topics
Azure
CommsNet
Compass
Databases
DD Boost FS
Disk Space
Files
Gateways
HeidiSQL
iNeed
Keepass
Linux
MariaDB
MongoDB
MySQL
Network
Organization
PostgresSQL
PowerBI
Remote Desktop Manager
Replication
Service Desk
Setup
UA Notifications
UN Base
UNICC
Updates
WHO
Windows
Markdown
# ESB — Enterprise Service Bus ## Status - **Handover planned:** Before end of June 2026 - **Migration:** Dev team migrating to Azure API Manager — they will take over the application - **Current owner:** DS team (Carlos) ## Tech Stack - **Container:** JBoss Fuse - **API management:** WSO API Manager (API endpoints) - **Database:** MySQL — 3 nodes, clustered ## Architecture - Java-based middleware - Sits between systems as integration layer - WSO handles external API endpoints ## Servers - Located at: (TBD — on-prem RHEL, see ST items) - Environment: PROD + DR (alignment gap known issue) ## Key Contacts - Dev team: handling Azure API Manager migration - DS team (Carlos): current operational owner ## Known Issues - ESB DR alignment gap (PROD vs DR not in sync) - Log4j vulnerability — closed with justification (Azure migration planned) - SCOM alerts for REST API services unavailability (IM-1-12591273206) ## Open Tasks - Alert mechanism in ESB (task-2746e915e7) — in sprint W13 ## Knowledge Gaps - [ ] List of PROD server hostnames - [ ] ESB DR gap — what exactly is out of sync? - [ ] Most common incidents and resolution steps - [ ] WSO API Manager version ## Handover Status (updated 2026-03-26) - Zero DS involvement planned post-handover, but not fully decided yet - Azure API Manager migration ongoing — dev team leads ## Upstream connections - Transparent to DS — not worth documenting fully given handover timeline ## SCOM Monitoring (as of 2026-03-27) ### Current active monitors - Server health (general) - CPU / disk - TCP check on api.un.org:443 ### Known gap - ESB API Services panel in SCOM is **empty** — old API monitors were removed and never replaced - Only app-level check is TCP port → does NOT confirm the application is actually working ### Proposed fix (pending dev team response) - Option A: Dev team points to an existing meaningful API endpoint to monitor - Option B: Dev team creates a lightweight endpoint returning HTTP 200 OK - Next step: Saurav (dev team) to confirm which endpoint to use - Once confirmed: configure in SCOM, possibly open RFS ### Related SCOM dashboards - Critical Applications dashboard - ESB dedicated dashboard ## Azure API Manager (APIM) Rollout - **Status:** In progress — dev team migrating APIs one by one - **Target completion:** End of June 2026 - **Contact:** Saurav Datta (ESB developer) ## PMDS 2026 Objective (added 2026-04-01) **Objective:** Support the handover of the ESB platform to the development team and contribute to infrastructure cost optimization, ensuring a clear transition path by end of cycle. **Planned Outputs:** - Support infrastructure cost optimization by assisting with resource consolidation, removal of unnecessary servers, and migration to Proxmox to reduce operational costs. - Collaborate with the development team to define and document the ESB handover process, covering infrastructure scope, responsibilities, and transition milestones. - Contribute to the migration of remaining API endpoints and post-migration infrastructure definition in coordination with the development team. - Ensure all prerequisites for removing ESB from the support catalog are identified, tracked, and progressed toward completion. **Notes:** - PMDS cycle ends May 13, 2026 (mid-term review); full handover target is end of June 2026 - API migration will not be complete by May 13 — outputs are framed as contributions/in-progress - Carlos's role: supporting (not leading) both handover and cost rationalization ## Cost Rationalization & Proxmox Migration (added 2026-04-01) - **Parallel effort** running alongside the Azure API Manager migration - Goal: reduce operational costs — consolidating resources, removing unnecessary servers - VMware → **Proxmox** migration underway (cost-driven, not part of Azure migration track) - Some servers already decommissioned (Jan–Apr 2026) - Important distinction: - **Partial decommission** = cost rationalization (remove unused infra now) - **Full decommission** = end of migration (all on-prem ESB infra gone post-migration) - Carlos supports this effort; does not own cost targets or manage the rationalization project
Cancel
Save
Stop Timer
Activity comments